MANILA, Philippines — The Energy Regulatory Commission (ERC) announced that it has issued the 2025 Amended Rules Enabling the Net-Metering Program for Renewable Energy.
The regulator said this development aimed to streamline the implementation of the net-metering program and make renewable energy (RE) adoption more accessible to qualified end-users.
Following a series of public consultations and careful review of stakeholders’ inputs, the ERC issued Resolution 15, Series of 2025, introducing key amendments aimed at strengthening consumer protection and simplifying processes for availing of the program.
ERC amends net-metering rules to expand renewable energy options

As per the ERC, one of the key amendments permits the banking and rollover of net-metering credits toward a qualified end-user's electricity usage across current and future billing periods.
It added that in the event of a property ownership change, the credits may be transferred to the new owner, subject to conditions such as a conforme letter from the original owner.
Net-metering allows customers of distribution utilities to install an on-site Renewable Energy (RE) facility not exceeding 100 kilowatts (kW) in capacity so they can generate electricity for their own use.
In turn, any electricity generated that is not consumed by the customer is automatically exported to the distribution utility's’s distribution system., This news data comes from:http://kgs-olij-khb-poue.redcanaco.com
- Wife of Australian man wanted in police killings urges him to surrender
- Repairs on Chinese ship in Bajo de Masinloc collision may take 2 months - PH Navy
- LPA over West PH Sea develops into tropical depression, now called ‘Jacinto’ -- Pagasa
- PNP disputes China's crime advisory, says Philippines crime rate dropped
- COA probes Iqbal on spending of P1.7B in one day
- Artikulo Onse' group calls for independent panel to probe flood control corruption
- Pagasa: Rainy Monday over Visayas, Luzon areas due to LPA, 'habagat'
- Nartatez rules out 'quota' arrests
- DPWH chief rejects calls to resign as he vows to probe corruption in flood control projects
- DSWD's guarantee letters now accepted in more establishments